| 1. |
India has received a Loan from the Asian Development Bank (ADB) towards the cost of the Kolkata Environmental Improvement Project and it intends to apply part of the proceeds of this loan to payments under the contract for which this Invitation for Bids is issued. |
| 2. |
The Kolkata Municipal Corporation (The Employer) represented by Project Director, Project Management Unit, KEIP, invites sealed bids from eligible bidders for the Construction of Pumping Station of Combined Flow (DWF & SWF) at Padirhati and the principal quantities involved, but not limited to, are : |
|
| Sl. No. |
Description of Items |
Unit |
Qty |
| 1 |
Supply, installation and commissioning of submersible motor non –clog pumpsets of 93 lps capacity |
Sets |
3 |
| 2 |
Supply, installation and commissioning of Column mounted submersible pumps for SWF application of 1427 lps capacity |
Sets |
3 |
| 3 |
Installation of transformers 1500 KVA & allied switchgear (HT & LT) for substations – 6KV/ 415 V supply |
Lot |
1 |
| 4 |
Power cables (XLPE – HT & LT), MCC panels and allied electrical work |
Lot |
1 |
| 5 |
Ancillary mechanical equipment like valves, piping, gates, crane etc. |
Lot |
1 |
| 6 |
Supplying and installing motorized manual screens |
Unit |
3 |
| 7 |
Water supply and Plumbing works |
Lot |
1 |
| 8 |
Supplying and laying of Rising Main of dia 1000 mm dia DI (K9) pipe |
M |
680 |
| 9 |
Construction of sump by well sinking method ( 8 m dia) |
Nos |
1 |
| 10 |
Civil works for construction of substation and other buildings including finishing works |
lot |
1 |
| 11 |
Infrastructural work within the pump houses and internal roads, pathways, paver block, surface drain, etc. |
Lot |
1 |
| 12 |
Mandatory Spares for 2 years normal operation for electrical and mechanical equipment |
Lot |
1 |
| 13 |
One year operation during warranty period |
Lot |
1 |
|
Exact details and specifications are provided in the bidding document.
Bidding procedure shall be single stage: two envelope procedure under National Competitive Bidding.
3. To obtain further information and inspect the bidding documents, bidders should contact
Project Director, PMU, KEIP,
Kolkata Municipal Corporation
206, AJC Bose Road, Business Towers,
2nd Floor, Kolkata 700 017
Ph : 2283 0169 / 2283 0170 / 22830554
Fax : 22830033
Email: info@keip.in ; website : www.keip.in
4.To purchase the bidding documents in English, eligible bidders should :
- write to address above requesting the bidding documents for Construction of Pumping Station of Combined Flow (DWF & SWF) at Padirhati
- pay a non-refundable fee of Rs. 5000.00 by way of demand draft favouring Kolkata Municipal Corporation, payable at Kolkata. The document will be sent by courier for an additional fee of Rs. 500.00 within India.
5. Bidders should satisfy the following qualification requirement and must demonstrate that :
- the bidder’s net worth is positive
- Minimum average annual construction turnover of Rs 165,000,000.00 calculated as total certified payments received for contracts in progress or completed, within the last 3 (Three) years.
- The Bidder must demonstrate access to, or availability of, financial resources such as liquid assets, unencumbered real assets, lines of credit, and other financial means, other than any contractual advance payments to meet the overall cash flow requirement: of Rs 25,200,000.00.
- Experience under construction contracts in the role of Contractor / Subcontractor or Joint venture partner for at least the last 10 (Ten) years prior to the applications submission deadline in the field of pumping station works.
- Participation as Contractor / Subcontractor or Joint Venture partner in at least 2 (two) contracts within the last 10 years, each with a value of at least INR 90,000,000.00 that have been successfully or are substantially completed (80 %) and that are similar to the proposed works.
A bidder having experience in executing civil works only in the field of construction of S & D works shall have to form a joint venture for supplying and executing electromechanical equipment / components of the works of pumping station and sub-station work. The same must be supported by credentials and performance certificates from clients/end-users for supplying and executing works in the field of electromechanical works, fulfilling the qualifying requirements of the bid.
The manufacturer of the SWF pumping sets must have supplied column mounted submersible pumpsets of similar duties (minimum 1.43 m3/sec ) for at least 10(ten) installations (must be supported by the performance certificate from at least 3(three) of previous purchasers) in the last 10 years
The manufacturer of the DWF pumping sets must have supplied 50 nos of non-clog submersible sewage pumping sets of 400 m3/hr capacity & above (must be supported by the performance certificate from at least 30% of previous purchasers) in the last 10 years
|
| 6. |
A Pre bid meeting will be held in the office of the Project Director, KEIP at 11.00 A.M. (IST) on 14.09.2010 Bidders are encouraged to participate in this meeting and it is desirable that bid document is studied thoroughly before this meeting. Project Director KEIP will arrange site inspection on 13.09.2010. Bidders are advised to send their representative(s) to KEIP office at the address above at 10:30 A.M. (IST) and proceed to site with PMU Engineers. |
| 7. |
Deliver your bid :
• To the address given above
• On or before the deadline 04.11.2010; 2.30 P.M.
• Together with bid security of 1,220,000.00.
• Bids will be opened at 3.00 P.M (IST) on 04.11.2010 in the presence of bidders representatives who choose to attend. |
|